Saturday, November 26, 2011

Just a quick update...

Just a quick update as not much has been happening over the past few weeks.

We have been in contact with the draftsman, and apparently the final engineering drawings were completed last week, so they should be making some action on the permit soon. I still suspect they are going to try and drag it out a few weeks so they don't have to make a site start before Christmas...

In the meantime, we have booked in for our colour and electrical appointment this coming Wednesday, the 30th of November, so at least something is happening! In preparation, we made a visit to Officeworks to pick up lots of coloured stickers and have a crack at the electrical plan. Here is the result:





This will probably change once we actually talk to the electrician, but at least it gives us a good starting point. Will update with more news after the meeting on Wednesday.

Sunday, October 30, 2011

Boys and girls, the word of the day is COMMUNICATION!

So, it has now been a month since the contract was signed. The loan has been approved and the documents have been signed and sent off, so this week we thought it was time to check up on what Keogh was doing....

In our last post we wrote that Keogh had told us they were waiting for the final engineered drawings, so we thought that the plans should be with council right now, right? Wrong....

Turns out that when Keogh told us two weeks ago that they were waiting for the final engineered drawings, they meant that they still had to give the draftsman the go ahead to start the drawings. This would be fine, except that the designer thought that the builder was following this up, and the builder thought the designer was following it up. End result? No one was following it up and nothing has been done - grrrrr!

So now it will take anywhere from one to three weeks to have the final drawings done up and checked, then another week or so to put together the council permit application. We asked about the likelihood of having a site start by Christmas, and the builder only said it is "probable". I think "probably NOT" is the more appropriate response, but maybe I am just being pessimistic.

One thing we did not want to have to do with these builders is ride their backs every week to make sure things were happening, like what we had to do with Premier, but now it looks like we are going to have to. We will be giving them a call again at the end of the week to make sure everything is on track again, and perhaps talk about scheduling in the electrical appointment and/or colours appointment sometime soon. I would just like to have something "housey"to do again - I think I am having withdrawals.

We did go and have a look at a beautiful open house on Saturday which helped to curb the housey urges a bit. The property in question is on a similar-sized block to ours, and the styling and look of the house was very much in line with what we want to achieve, so we thought it would be good to go along and see what ideas we could pick up.

Front view

Kitchen and family room - quite like the fretwork separating the kitchen

As expected, the house was beautiful inside, but I also love what they have done with the back deck and backyard. We are still going to need to put up another retaining wall between our house and the backyard once the house actually goes up, and it would be great to do something like what they have done. Got some great ideas from this excursion, so it was well worth the trip.

Backyard - like this retaining wall and how they have done the steps into a wide lawn area

Like the look of this deck area too

In other news, we have now been blogging about our house building experience for 12 months - seems to have gone quite fast (although we still don't have a house!). In that time we have signed contracts with two builders, terminated the services of one builder, and visited more display homes than you can poke a stick at!

We have had over 2,600 page views since starting the blog, and thanks to our widely-travelled friends, we have had visitors from the US, Germany, the UK, New Zealand, Latvia, and even Mongolia! Wow!

Here's to the next 12 months - and our house finally getting built :)

Monday, October 10, 2011

Loan approval and some light shopping

Got a lovely email from the bank on Friday to say that the loan has been approved, pending acceptance of the First Home Owners Grant (which I don't see us having a problem with since it has been accepted once before!).

Ben called Keogh today to let them know of the loan approval and to find out how they are going with the permits and so on. Turns out that they are still waiting for the final engineered drawings before they can apply for the permit, but they are expecting them this week sometime. Once that has all been submitted, they will be scheduling the colour selection meeting and the electrical appointment....can't wait!

In the meantime, we thought we would go have a look at lights to give us an idea for the electrical plan. We had already purchased this light earlier in the year from Recollections, to go over the bench in the kitchen in our original Premier house design - luckily it will suit just as well in the new house design!


"Portia" Servery 3-light from Recollections

So given how much I like "matching" things in life, we thought we would go back to Recollections to see what they had in terms of pendant lights - just to look mind you, not to purchase. However, it turns out this 'Portia' range has now been discontinued - BUT, they happened to have ONE 6+3 pendant chandelier left, at 50% off no less - bargain! Definitely couldn't pass that one up.... this will look lovely over the dining table.

"Portia" 6+3 pendant light

Then, when the customer service assistant was ringing up the purchase, she helpfully offered to check the availability of the other sized lights in other stores. Turns out that the Mitcham store had one 6-light pendant left (also at 50% off!), so we raced over there and snapped up that one too! We are planning to put this one in the family room.

"Portia" 6 light pendant




Inspired by our bargains, I had a look on eBay to see what else we could source....

Unfortunately I couldn't find any matching "Portia" lights, but I did find these similar lights that I think would go well in bedrooms 2 and 3:

Lights for Bedrooms 2 and 3


We successfully bid for and won these items (another bargain!), and we pick them up next weekend.

So that is almost half of our lights sourced for the house in one weekend - now we just have to try and squish them into the storage locker.....







Sunday, September 25, 2011

Ding, dong the contract's signed!

I keep wondering what is going to go wrong, because everything seems to have gone off without a hitch this week....

Ben was working in the Tarneit area on Thursday and Friday this week, so he dropped into the Keogh office on Thursday afternoon to see if the contracts were available yet. He was told to come back on Friday and they would be ready then. The next morning he gets a call at...wait for it....6.30am (!) to say that the contracts were ready to be picked up! Hooray!

We poured over them on Friday night ahead of our 9.30am meeting on Saturday morning. The HIA contract part was easy, because we have gone through all of that before. Specs were good too - we couldn't find ANYTHING wrong with them at all.

So, we then rocked up to the meeting on Saturday morning with no changes to be made - Frank had set aside 2 hours for the contract signing, so about half an hour of that time was spent actually signing the contract, and the other hour and a half was spent talking about his recent trip to the NT and all of his tips for the building process.

After leaving the Keogh offices we decided to stop in at The Tile People just up the road to get started on researching what is available. After wandering around for 15 mins feeling a bit overwhelmed about all the choices, a lovely sales person named Deb really helped to narrow things down. Even though this wasn't a "tile selection appointment" as such, she spent about an hour with us showing us all the options and pulling together a nice theme for the bathroom and en suite.

We have decided to put a feature wall on the wall separating the shower and the vanity in the en suite:


I want it to have a similar effect to this (but without the bath in between):


So these are the colours we have chosen so far for the ensuite (clockwise from top left):

  • Wall tiles in shower / above vanity
  • Stone tile for feature wall
  • Laminex samples of the vanity bench ('Stipple Seal') and vanity cupboards ('Moleskin')
  • Floor tiles (I think these were called 'Millenium Black')



For the main bathroom we are going to have the same tiles for the walls and floors, but in the shower we are going to use the following as a feature stripe down one wall:



We didn't get the names of the tiles yet as Deb is going to put together a list of all we have chosen and email it through to us on Monday. We will still need to go back and make a formalised tile selection appointment as we didn't get to doing the laundry or kitchen, but at least we will have a good idea when we go.

Deb gave us samples of all the tiles except the stone one to take home. When I was having a closer look at the floor tiles this afternoon, I got a very familiar feeling....so I dug out the samples from the original tile selections that we had done with Ultimate Tiles for our Premier house and...low and behold, they are the same tile! I guess no one could say we aren't consistent about what we like!

Same tiles - the little one up the top left corner is the version we had originally selected with Premier, and the large one is the one we selected yesterday for our Keogh house

So what are the next steps?

  • While we organise getting certified copies of the contracts to the bank, Keogh will be organising the final engineered drawings, applying for the council permit, and so on;
  • We will meet with the builder and electrician in a few weeks to finalise our colour selections and electrical plan;
  • We are going to be providing most of our own light fittings so we are going to be researching our options in this area before the colour and electrical meetings to make sure everything ties in with the overall 'theme'.




Monday, September 19, 2011

Side fence + back fence = our property is now half fenced!

Came home last week to an interesting letter in the mailbox - the rear neighbours are almost ready to move in and want to start putting up fences! Seems like this house has sprung up overnight...I'm sure it was only a few weeks ago that they had just started bricking!

In any case, we gave our new neighbours a call to discuss the fencing. Turns out he is a chippy and wanted to put up the timber fence himself at cost price through materials sourced through work. We were hoping to put up a Colorbond fence rather than timber, but our new neighbours were set on timber so we acquiesced. The fence bordering the existing houses is timber too, so at least the new fence matches in (although we will need to get some of the existing fence replaced as it is in quite a state of disrepair).

He is a fast worker, because a few days later we got a call to say it was all done! Given the warm weather on this weekend just gone, we made the trek from Watsonia to Kilmore again to check out the quality of his workmanship. I must say, it is looking good...although it has skewed my perceptions on the actual size of our block - it makes the block look a lot shorter in my opinion, although Ben assures me that we will still have about 30 metres of backyard for the dogs to run around in.


Our new back fence


While we were there we also took along a copy of the plans, some string line and our big measuring tape so we could mark out the house. Two hours later and we were able to walk through our "house" - very cool! It is a bit hard to see the string line in these pictures, but some of the markers should be visible.

Marking out the house


In other news, final plans have arrived in the mail and it is still looking like a go for final contract signing on the 24th of September. We hope to see the contracts in the mail this week....hooray!

Thursday, September 1, 2011

We have plans!

We received a very special package in the mail yesterday - our plans! It's very exciting :) The building process is finally starting to feel real again, like something is actually happening....

Ben ran out to Officeworks today to make some big copies so that we can go over everything with a fine-tooth comb. He got some done up in A2, then decided that wasn't big enough so went back for an A0 version - it's huge! It's looking good so far, with only a few little things that require changing.

Frank from Keogh gave us a call to follow up on the plans today, and we have made a tentative booking for a meeting for the 24th of September to sign the final contracts, giving us a few weeks to make any changes to the plans beforehand. With any luck, we may actually have something done on site before Christmas!

In the meantime, we have started to think about what colours we want for the outside of the house, so we stolen your idea Linda and made a trip to Bunnings to get some sample pots so that we can have a go at colouring the house plans. We are going to attempt this over the weekend, so will post up our efforts in a few days time.

Here are the plans as they currently stand though - click the images to see a larger view if you wish.


Floor Plans




Site Plan - heaps of room in the backyard for the doggies to run around in!




Front Elevation


Side and Rear Elevations


Sunday, July 10, 2011

Let's talk about price, baby!

Let's talk about price, baby!
Let's talk about you and me
Let's talk about all the good things, and the bad things
That could be...
[Sung to the tune of 'Let's Talk About Sex' by Salt 'n' Pepa - pathetic, I know!]

We received the preliminary quote from Keogh via email on Monday evening, and this was followed up by a face-to-face meeting on Saturday morning. As for the price...drumroll please!......we have come in at about $10,000 more than our initial Premier contract.

However, this is primarily driven by the fact that this quote includes provisions for Keogh to provide the outdoor decking and Caesarstone benchtops in the kitchen, neither of which we chose to include with Premier. The question is now, should we cough up the extra $10k and keep these options, or move them onto our list of things to do after handover? Decisions, decisions.... 

So far the biggest components of the quote are the stumps/site costs and the timber flooring, which are to be expected. The other big cost is the kitchen. We are going to style the kitchen on Premier's Delatite / Jamieson kitchen, with white vinyl wrap cabinetry and a country mantle. However, the actual shape of the kitchen is a little different - more of an 'L' shape and then a separate island bench. Somehow, I think we might have just enough storage space in the kitchen - at last count, we are up to 15 pot drawers!

Refresh: This is the kitchen in Premier's Delatite



There are still a few small things that we tossing up upgrading throughout the house, and I don't really see anything else that we could cut out apart from the deck and the Caesarstone benchtops, so if we want to keep close to the original contract price then these are the things that are going to have to go. That, or we scale back the kitchen in some way.

What are your thoughts on having a double vanity in the ensuite? The bench in the ensuite is 1800mm long, so it is definitely long enough to comfortably fit two sinks, but I don't know what the advantages or disadvantages would be for this set-up. I like the look of having two sinks, but what does it really mean in practical terms? How does this affect the storage space in the cupboards underneath, having all that added sink paraphernalia?

Today we continued the house-oriented weekend by visiting our storage locker, as we needed to confirm the measurements of the fireplace and hearth that will be going in the family room - I had forgotten how big the mantle actually is! Should come up really nice in this room though, especially once we get the insert sandblasted and repainted and put in our pretty flowered tiles.

Pretty fireplace

So what are the next steps?

We have scheduled in the next meeting with Keogh for two weeks time, so we have until then to decide what changes we want to make to the current specs. If everything is okay, we will then sign the Preliminary Building Agreement and proceed to drawing up the contracts - hopefully this process will go much quicker than it did with Premier!


P.S. We have also updated the pic of the house in the header, as this is a more accurate reflection of what the house will look like now (except for the dormer window). We are thinking of using a similar colour scheme, and we will be having the same archwork as shown here.