What gorgeous weather we had this weekend in Melbourne! I spent the weekend relaxing at a Leader's Retreat in Riddells Creek with my fellow Girl Guide leaders - it was a lovely way to spend a weekend. My legs are killing me after all of that Zumba and Yoga though!

On the way, of course we had to do a slight detour and check on the block - turns out that the chippies had a busy day on Friday and the framing is almost all completed, just the garage/laundry and a few more windows to be framed, and a bit more flooring to be put down. Then comes the roof... It was great to be able to walk through each of the rooms in the meantime though (even if we did need to use our balancing skills in a few of them!).

Now for the most important part - the pictures! First, the outside shots....

Front view

Another front view

Another front view - from the opposite corner

Back view - theatre room and family room

View from the other back corner - garage still to be framed



Now for the inside shots....

Looking out of the window in the "theatre room"


Family room - this is the framing for our fireplace

Another shot of the family room - as you can see, still need flooring here

Dining room and kitchen

Kitchen - framing for fridge space and mantle area

Sliding doors from dining room out to the deck area

Loving the size of the pantry!

Study

"Server cupboard" in the study

Bedroom 3

Bedroom 2

Looking down the hallway


Sunday, April 8, 2012

Things are starting to feel real now...

Happy Easter everyone!

Hope you are all having an enjoyable few days off. We have spent the past few days camping with friends at Mt Disappointment. 

Mt Disappointment is located conveniently close to the block, so on Friday we took a quick trip into town to check on progress. On Wednesday, PK had told me that he didn't expect the framing to have started yet given the short working week. We drove up expecting to see just the flooring laid (at most), so you can imagine my excitement to see this:

We have walls!

So far, they have framed up our master bedroom, the walk-in robe and en suite, the bathroom and toilet, and the theatre room at the back of the house. We actually got to walk through some of our rooms for the very first time  - very exciting! Now it is starting to feel like a real house...

En suite

En suite window (looking out from the shower) - eventually there will be a fernery out here

Walk-in robe

Main bathroom

Back view of the theatre room
Long shot from the front corner


We also took Oscar and Kody with us, and they had a great time exploring the backyard and meeting all of their new doggy neighbours!

Oscar trying and failing to jump up



Kody: 'Like this Oscar!'




Saturday, March 31, 2012

How much wood could a woodchuck chuck, if a woodchuck could chuck wood?

The answer? This much apparently....


That's right folks, we have timber!

Furthermore, this week the stars aligned and the gods looked down on us and Ben was scheduled to be working in Kilmore all day on Friday - perfect opportunity to see what has been happening up at the block.

He thought he would swing past the block at about 7am before starting work, only to be greeted by chippies already on site and starting to lay out the floor joists! Hooray for progress!







Of course he had to go back multiple times during the day to check up on their progress...







These guys work very quickly (especially with the weather on their side), and by about 4pm they were done! Just a tiny little bit to go on the front box window since they ran out of hardwood.



Ben got chatting to one of the guys, and in terms of timing we are now looking at the tongue and groove flooring being laid on Monday, and they will then be moving onto the wall framing by the end of the week. The chippies expect the windows and the roof trusses to arrive on site any day now, and barring any major weather delays, we should have walls and a roof completed by ANZAC Day. It will only take a few days to put on all the weatherboards, so lock-up will be here before we know it!





Sunday, March 25, 2012

Concrete soldiers, standing at attention

It has been a few weeks since our last update, but there were some issues with the stumper and his machinery breaking down, so not much has been happening until last week. But that has all been sorted now, so when we went past the block this weekend we were greeted by our concrete soldiers, standing at attention in their nice straight rows:


View from the street


Side view

View from the back corner


Spoke to PK on Thursday, and the flooring timber has been ordered and the carpenter is ready to start on the flooring tomorrow. Should be done by the end of the week, and framing can continue straight from there. Very excited about what we will be seeing next weekend when we make our next visit...


Wednesday, February 29, 2012

Rain, rain, go away...

Damn this Melbourne weather! Got a call from PK this afternoon to say that the stumper arrived on site today, but quickly decided that the block was way too sloppy to even attempt to use any machinery this week. Understandable when you consider that Wandong got 45 ml of rain on Sunday/Monday, Beveridge got 85 ml, and Seymour got more than 100 ml!    

I know that rain is predicted for the next week or so, but here's hoping that the block will dry up enough for the stumper to at least make another attempt this time next week. It's a bit sad that summer seems to have well and truly disappeared now...


7-day forecast is not looking too positive...

Sunday, February 26, 2012

Slab party!

So happy...we now have a garage slab! Hooray for progress!

Front View (including our new meter box)


Back View (including the drainage point for the laundry)



Close up view 


The tap that the plumber originally placed smack-bang in the middle of the driveway has also been moved to a more sensible position:




Two of our neighbours have also been making cracking progress. As far as we knew, this block was still for sale two weeks ago when we last visited our site, now they have drainage! The race is on...

Drainage already!


Our neighbours have all put their fences up, and you might be able to squint and see the beginnings of a slab for the middle house





Sunday, February 19, 2012

So apparently stumpers are hard to find nowadays...

Received a call from the builder last Monday to discuss the happenings with the build.

Apparently, we haven't been seeing much action on site as they have been having difficulties finding a stumper who would be willing to travel to Kilmore. Given that they have not built a house on stumps for about 10 years, they didn't have many contractors on their books to choose from.

All is good now - they have now made contact with a stumper willing to travel (who comes highly recommended by the surveyor) and everything is good to go again.

Unlike a slab house, we will not need drastic excavations done for our drainage as it will all be underslung under the floor joists and connected to the outlet at a later stage. The only drainage required at this stage will be for the laundry, which is being built as part of the garage slab. The garage slab should be done this week, and once that is set, the stumper will come in to do the stumping. Keogh expects all this foundation work to be completed in the next 2-3 weeks.

At this point you may be asking yourself, why even build on stumps at all?!

Well...when building on completely flat ground, building on a slab is far cheaper than on stumps. However, as the land slopes more and more, there reaches a point where building on stumps becomes more cost effective because it basically offsets a lot of the excavation and site works required to build on a slab.

So let's imagine for a moment that we had a graph showing the cost of building on stumps vs. slab, where cost is the y-axis and land slope is the x-axis (let's just simplistically leave it at the single level of land slope at the moment). If both graphs are linear, with stumps starting out as more expensive, as land slope increases at some point the cost of building on a slab and on stumps should meet and cross over - eventually resulting in some cost economies to building on stumps.




While our block is not quite at the point where building on stumps was cheaper than a slab, we were quickly approaching that crossover point. Additionally, the added benefits of stumps (and personal preference!) over slab pretty much sealed the deal , making the extra costs worth it in our minds. Like everything, it all comes back to the $$$....from what I have read, this is the main factor that dictates the popularity of the slab in modern buildings.

For our personal situation, we weighed up the pros and cons of stumps vs. slab and came up with the following list:

PROS OF STUMPS:
- Extra space under the house for storage
- Insertion points for ducted heating can be installed under the floor (more energy efficient, as hot air rises)
- Ease of service additions later if required
- More in keeping with the traditional "feel" of Kilmore
- Easier to check for termites
- Slabs are vulnerable to water and roots - water or roots can crack a slab, and once moisture gets in this can cause concrete cancer that can never be detected until it reaches an advanced stage

CONS OF STUMPS:
- Bearers and joists are comparatively more expensive than concrete
- Takes longer time to build on stumps
- Other items required to be incorporated into the build to attain a 6 star energy rating (e.g. require underfloor insulation)

On balance, we have more pros for stumps than we have cons, which is why we decided to take this option - that is not to say that slabs do not have their pros either, it just wasn't going to be as suitable for our situation.