Tuesday, July 24, 2012

All in a day's work...

The builders and plasterers were very busy today finalising most of the remaining items for the fix. Lots and lots of progress today:
  • All skirts and architraves have been installed
  • Shelving in all the cupboards and the master walk in robe are done (just waiting on the materials to finalise bedrooms 2 and 3)
  • Flue has been installed in the chimney
  • Extra ceiling panels have been installed in the family room, hallway, bedroom 2 and bedroom 3
  • Fretwork has been installed in the hallway
  • Doors and handles have been installed

The fix should be completely finalised in the next few days, then we should see the painters, the tilers, and the electrician move in. 

Lots of pictures of all the work today:

Theatre architraves

Theatre room with the doors closed

Architraves and skirting installed in the dining room

Skirting highlights in the kitchen

I like how they have carried the skirt around the fridge space, and have
neatly cut out the water point

Linen cupboard fitted out

Left side of the walk in robe - oh the shoes I can store up on those shelves...can't wait!

Back of the walk in robe

Right side of walk in robe

Cabinet in the family room

Pantry shelving 

Close up of the door handles (and a smudgy door)

Bullnose window sill over the kitchen sink

Another bullnose sill around the window seat

Holes in the ceiling ready for the ceiling rose to be installed

Pressing it into place

Done!

Ceiling rose in the hallway

Hallway fretwork

Front shot after a bit more of a site clean up