Second site visit for the week so that he could collect the timber flooring, and Ben managed to catch the drainage guy on site doing some digging and laying some pipes - lots of pipes!
Hopefully this will help to make the site a lot less sloppy and muddy now. We are also going to drop some crushed rock around the house this weekend to make things easier for the painters, who are booked to come in and start next week.
|
Now that's a long pipe |
|
Cute little 1.5 tonne excavator - seems so tiny in comparison to Jarrod's 3 tonne one from the weekend |
|
The drainage guy has put in lots of these inspection points in the front and back yards to help out with our soon-to-be-installed retaining walls and future water tanks |
|
Yet more pipes... |
|
With the slope on the driveway, we are definitely going to need to put a drainage grate in front of the garage so that it doesn't get flooded |
|
Pipes all buried again |
It also looked like the builders had been on site today to finish some more of their fix, including the last few boards on the verandah:
Installing the laundry door:
And fitting out the rest of the wardrobes:
|
Bedroom 2 |
|
Double hanging rail in the master walk in robe |
No comments:
Post a Comment